A walk-in shower simply means one you enter without stepping over a tub wall. Beyond that, the options range widely: how big it is, whether it has a curb, what kind of glass encloses it, where the drain sits and what goes on the walls. Most of the shower remodels we do in Plano replace a small fiberglass stall, a tub-shower combination or a garden tub with something larger and easier to live with.
Three kinds of walk-in shower
Curbed. A low wall, usually 4 to 6 inches tall, holds water in the shower. It is the simplest to build on a slab because the shower floor can sit at the same level as the bathroom floor, sloping to a center drain inside the curb.
Low-curb. A curb of an inch or two, often with a sloped profile, gives most of the open look of a curbless shower at lower cost. It suits many Plano hall baths and primary suites where the budget matters.
Curbless (zero-entry). The bathroom floor flows into the shower without any step. On a slab, that means recessing the shower area into the concrete so the floor can slope to a linear drain while staying flush at the entry. It is the most elegant and the most accessible option, and it takes the most planning.

How we build a shower that stays dry
The tile is not what keeps water out of your walls; the system behind it is. Every walk-in shower we build follows the same sequence:
- Demolition to the studs and slab. Old tile, backer board, any mortar bed and the old pan come out so we can see the framing and the concrete.
- Framing and blocking. We straighten walls, frame niches and benches, and add solid blocking for grab bars and glass hardware before anything is covered.
- Drain and pan. The drain is set where the layout calls for it, and the floor is sloped evenly to it, typically a quarter inch per foot.
- Bonded waterproofing. A continuous waterproof membrane covers the floor, the curb and the walls, with sealed seams, corners and pipe penetrations.
- Flood test. We plug the drain and fill the shower floor with water, then check that the level has not dropped before any tile goes in.
- Tile, grout and sealant. Tile is set over the membrane, with soft joints where walls meet and where the shower meets the floor.
- Glass. Frameless glass is measured after tile so it fits the finished surfaces exactly.
Features worth planning in
- A bench, built-in or floating, for shaving, sitting and later in life.
- A niche long enough for real bottles, placed out of the direct spray and away from where the glass will be seen.
- A handheld on a slide bar in addition to the fixed head, with its own valve or diverter.
- A linear drain, which lets the floor slope in one direction and works with large tiles.
- Light inside the shower, with a fixture rated for wet locations.
- A taller enclosure, sometimes to the ceiling with a small transom for steam, depending on ventilation.
Hard water and walk-in showers
North Texas water leaves white spots on glass, chrome and dark tile. We suggest glass with a factory protective coating, matte or brushed fixture finishes that hide spots, lighter grout colors and a squeegee habit. A water softener helps more than any finish does if hard water bothers you throughout the house.
What a walk-in shower costs in Plano
A walk-in shower remodel in an existing footprint commonly runs from the low teens to the low twenties in Plano, depending on size, tile and glass. Curbless showers, relocated drains, large-format or stone tile and full-height glass push costs higher. HomeAdvisor's Plano bathroom data averages $10,468, and This Old House reports full remodels averaging $17,794 to $33,809 locally; a shower-only project usually sits between those. Try the estimator with the curbless and glass options switched on to see the difference.
Walk-in shower permits in Plano
Replacing a shower in the same location with the drain where it is typically does not require a permit. Moving the drain, changing walls or adding circuits does. We pull any permit needed and coordinate the plumbing and electrical inspections. See Plano bathroom remodel permits.
An example walk-in shower in a Plano hall bath
As an illustration, consider a 1988 Plano single-story with a hall tub-shower that the owners want to replace with a walk-in shower, since the primary bath has a tub. The tub comes out, and a 60-by-34-inch shower goes in with a low curb, a niche, a corner shelf, a pressure-balancing valve and a handheld on a slide bar. Porcelain in a matte finish covers the walls, and a small hex mosaic covers the floor for grip. A frameless door and fixed panel close the opening. Expect about 17 working days at the house, with glass following.
Shower controls and layout
Where the controls sit matters. Placing the valve near the entrance lets you turn on the water and wait for it to warm up without getting wet. A handheld on a slide bar adjusts for different heights and helps with cleaning. If you want multiple outlets, like a rain head plus a handheld, a thermostatic valve with volume controls lets you run them together or separately.
Lighting a walk-in shower
A wet-rated recessed light inside the shower makes a big difference, especially in larger showers with solid glass panels or half walls. Lit niches add a soft glow. We plan the lights during rough-in, so wiring is in place before tile.
Shower floor tile options
Shower floors need grip and the ability to follow the slope to the drain. Small mosaics, such as 2-inch hex or penny tile, work well with center drains. Bigger tiles pair best with a linear drain and a floor pitched one way. Matte and textured finishes improve traction.
Choosing a walk-in shower drain
Center drains are standard and cost less. Linear drains allow larger floor tiles, curbless entries and a more modern look. Tile-in drains hide the drain under a strip of the same tile for a seamless finish.
Walk-in showers for every Plano home
Whether your house is a 1970s ranch in east Plano or a 2000s two-story near Legacy, a walk-in shower can usually fit. In compact rooms, it replaces a tub. In large suites, it absorbs the garden tub space. We design the shower around your space, your routine and your budget.
Shower installation and shower replacement in Plano
A new shower installation in a Plano home usually happens one of three ways: replacing a failed shower in the same footprint, converting a tub alcove, or building a larger shower where a garden tub once sat. A straight shower replacement is often the quickest, since the drain and valve may stay where they are, but we still rebuild the pan and waterproofing from scratch rather than tiling over old layers. That is how a replacement shower lasts as long as a brand-new one.





